PROJECT OVERVIEW

The NSW Government’s vision for Sydney is one of an integrated road and public transport network that gives you the freedom to choose how and when you get around, no matter where you live and work.

One area of focus is completing the missing links in the Sydney motorway network to improve traffic flow. This high capacity network is vital for supporting the growth of our communities, places and economy. This will ensure people and goods can move around our city and beyond, safely and reliably.

Sydney Gateway is key to this vision and will greatly improve the way we travel to Sydney Airport and Port Botany. It will deliver new toll-free connections from the Sydney motorway network to the International and Domestic terminals.

Sydney Gateway will strengthen Sydney’s position as a global city, by expanding and improving the existing road and freight rail networks. Importantly, Sydney Gateway will provide a new route for around 10,000 trucks a day. This will divert trucks from local streets in Mascot by providing an alternative route, reduce travel times and congestion, and return local streets to the community.

CARRABAY SCOPE

Carrabay are contracted by the John Holland/Seymour Whyte Joint Venture to construct retaining walls, drainage channels, concrete barriers.

The scope also includes the supply of the reinforcement.

The works is being carried out adjacent to earthwork activities, bridge works where day to day planning and co-ordination take place to ensure that the site remains safe for all activities.

All the shutter systems used are a panel system and conventional formwork which enables efficient construction in a confined work area.

All temporary works and permit to loads are carried out inline with both company procedures, designers requirements and Australian standards.

The client have praised Carrabay being proactive, safe and assisting in the planning of these works during the early stages of these works.

TYPE OF CONTRACT

Lump Sum/SoR

CONTRACTORS REPRESENTATIVE

Melody Selim
Senior Project Engineer

CONTRACTORS REPRESENTATIVE DETAILS

Tel: 0404 607 861
Email: melody.selim@jhsw.com.au

ENQUIRY FORM

  • Max. file size: 512 MB.
  • MM slash DD slash YYYY